Duration and ERP: Difference between pages

From ACT Wiki
(Difference between pages)
Jump to navigationJump to search
imported>Doug Williamson
(Add link.)
 
imported>Doug Williamson
(Layout.)
 
Line 1: Line 1:
1.  
1.  


In finance, duration - strictly defined - is the weighted average timing of all of an instrument’s cashflows, where the weightings are the present values of the cashflows at the current market yield.
Equity Risk Premium.


By formula, Duration = Sum(PVt)/Sum(PV).


2.


Duration is widely used as a risk measure of a portfolio of assets or liabilities.
Enterprise-wide Resource Planning.


It gives a general indication of the sensitivity of an instrument's or a portfolio's market price to small changes in market yield. 


(Modified duration measures this in a more refined way.)
== See also ==
 
* [[Equity risk premium]]
 
* [[Enterprise-wide resource planning system]]
Broadly speaking, the longer the duration, the more sensitive the market price is likely to be to (small) changes in interest rates. 
* [[Enterprise resource planning]]
 
Duration is also used as a measure to compare debt securities that have different maturities and yields.
 
 
More strictly, the duration of an instrument specifies the remaining life of a zero coupon bond with the same value sensitivity (to a very small change in yield). 
 
Both can be regarded as equivalent to a single future cash flow after this period of time.  If there is uncertainty about the timing or the occurrence of future cashflows - for example a call option on a bond - then the concept and calculation of duration becomes more complex.
 
 
Not to be confused with ''maturity'', which is different.
 
 
2.
 
More loosely, the terms ''duration'' and ''Modified duration'' are often used interchangeably. 
 
Obviously this can lead to potential confusion, so it is important to clarify whether duration or modified duration is intended in any particular context.




== See also ==
===Other links===
* [[Convexity]]
[http://www.treasurers.org/node/9217 The ABC of ERP, The Treasurer, July 2013]
* [[Effective duration]]
* [[Fisher-Weil duration]]
* [[Life]]
* [[Macaulay duration]]
* [[Maturity]]
* [[Modified duration]]
* [[Short duration]]
* [[Ultra short duration]]


[[Category:Financial_products_and_markets]]
[[Category:Corporate_financial_management]]
[[Category:Corporate_finance]]
[[Category:Technology]]

Revision as of 11:41, 11 May 2016

1.

Equity Risk Premium.


2.

Enterprise-wide Resource Planning.


See also


Other links

The ABC of ERP, The Treasurer, July 2013