Graphs and diagrams test page and Risk register: Difference between pages

From ACT Wiki
(Difference between pages)
Jump to navigationJump to search
imported>Doug Williamson
(Correct typo: procedures.)
 
imported>Doug Williamson
m (Spacing 20/8/13)
 
Line 1: Line 1:
This is a test page to reaquaint procedures for inserting pictures.
''Risk management''.


It has been Protected so that only administrators can access it.
A table or other appropriate structure used to facilitate the description and assessment of risks.  


Syntax is File:filename.extension|options|caption all enclosed in [[  ]]
The use of a well designed structure is necessary to ensure a comprehensive assessment process.  


filename.extension is the name of the file in the Media file list
Strategy/objectives should also feature to identify function responsible for developing strategy and policy.  


By considering the consequence and probability of each of the risks,it should be possible to prioritise the key risks that need to be analysed in more detail.


This is the full size download of file using syntax [[File:filename.extension]]. This has no formatting or options.


[[File:Test clipping for wiki media.png]]
== See also ==
 
* [[Risk appetite]]
By adding in options this can alter the size of the media to a preformatted size.
* [[Risk management]]
 
* [[Risk tolerance]]
Format option: one of border and/or frameless, frame, thumb (or thumbnail). If multiple of these options are present, only the first one will be used;
Controls how the rendered image is formatted and embedded in the rest of the page.
 
'''Border'''
 
[[File:Test clipping for wiki media.png|border]]
 
'''Frame'''
 
This puts the media to the right but adding |left will move it to left.
 
[[File:Test clipping for wiki media.png|frame|left]]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
'''Thumb'''
 
[[File:Test clipping for wiki media.png|thumb|left]]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Resizing option: one of
{width}px — Resizes the image to fit within the given maximum width in pixels, without restricting its height. (A space character between the width value and "px" is permitted.)
 
''350 px width''
 
[[File:Test clipping for wiki media.png|{350}px|350px]]
 
 
{width}x{height}px — Resizes the image to fit within the given width and height in pixels
 
'''CAN'T GET THIS TO WORK'''
 
[[File:Test clipping for wiki media.png|{50}x{50}px]]
 
 
Horizontal alignment option: one of left, right, center, none. If multiple of these options are present, only the first one will be used
Controls the horizontal alignment (and inline/block or floating styles) of the image within a text (no default value).
 
'''Centre'''
[[File:Test clipping for wiki media.png|border|center]]

Revision as of 14:07, 20 August 2013

Risk management.

A table or other appropriate structure used to facilitate the description and assessment of risks.

The use of a well designed structure is necessary to ensure a comprehensive assessment process.

Strategy/objectives should also feature to identify function responsible for developing strategy and policy.

By considering the consequence and probability of each of the risks,it should be possible to prioritise the key risks that need to be analysed in more detail.


See also