Key risk indicator: Difference between revisions

From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson
(Create s)
imported>Doug Williamson
(Classify page.)
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:


A Inc's key risk indicators for this risk measure the following:
A Inc's key risk indicators for this risk measure the following:
*number of bids outstanding
:*number of bids outstanding
*size of exposure in bids outstanding
:*size of exposure in bids outstanding
*length of tender and
:*length of tender and
*volatility of currency pairs involved in tender
:*volatility of currency pairs involved in tender


to produce an overall measure of risk for tenders.


to produce an overall measure of risk for tenders. The risk in tenders is then given a budget for overall risk, which is managed by the tendering team and their treasury colleagues.
The risk in tenders is then given a budget for overall risk, which is managed by the tendering team and their treasury colleagues.






== See also ==
== See also ==
* [[Canary in the coal mine]]
*[[Early warning indicator]]  (EWI)
*[[Key control indicator]]  (KCI)
*[[Key performance indicator]]  (KPI)
*[[Risk budget]]
*[[Risk budget]]
*[[Key control indicator]]
 
*[[Key performance indicator]]
[[Category:Compliance_and_audit]]
[[Category:Identify_and_assess_risks]]
[[Category:Manage_risks]]
[[Category:Risk_frameworks]]
[[Category:Risk_reporting]]

Revision as of 07:22, 23 June 2022

A measure which quantifies an important risk to which the organisation is exposed.

Example

A Inc operates in the capital goods sector and regularly makes tenders in foreign markets. The tenders are based on foreign exchange rates prevailing at the time of bid but there is risk in the tenders which is difficult to hedge because there is uncertainty over whether the tenders will be accepted.


A Inc's key risk indicators for this risk measure the following:

  • number of bids outstanding
  • size of exposure in bids outstanding
  • length of tender and
  • volatility of currency pairs involved in tender

to produce an overall measure of risk for tenders.

The risk in tenders is then given a budget for overall risk, which is managed by the tendering team and their treasury colleagues.


See also