Modified convexity and Replacement cost risk: Difference between pages

From ACT Wiki
(Difference between pages)
Jump to navigationJump to search
imported>Doug Williamson
(Categorise the page and align with ACT glossary.)
 
imported>Doug Williamson
m (Spacing 20/8/13)
 
Line 1: Line 1:
(MC).  
The risk of loss arising from the need to replace a contract before having paid away the principal amount.  


Broadly speaking, modified convexity measures the curvature of an instrument’s price function, as yields change - from a given starting point - by a small amount.
Often quantified approximately as the expected profit foregone.
 
More strictly, it is the rate of change of modified duration with respect to yield - at the given starting yield.
 
 
Modified convexity can be calculated from Convexity as follows:
 
'''Modified Convexity = C<sub>MOD</sub> = Convexity / (1+r)<sup>2</sup>'''
 
 
Where:
 
r = periodic yield = [[Nominal annual rate]] / compounding frequency per year
 
 
The estimation of price change for a given small change in yield can then be calculated as follows:
 
Price change estimation using Modified Duration (MD) only:
 
= - Price x MD x Change in yield
 
Price change estimation using Modified Convexity (C<sub>MOD</sub>):
 
= - [Price x MD x (Change in yield)] + &frac12; x [Price x C<sub>MOD</sub> x (Change in yield)<sup>2</sup>]
 
 
Because the value v yield relationship is a curve and not a straight line (values do not change linearly as yields change) the estimate of change in value using only modified duration will generally underestimate the new value (because the curve lies above its tangent). 
 
Therefore the modified convexity adjustment is always positive - it always adds to the estimate of the new price whether yields increase or decrease.
 
It is also possible to estimate the MD and the C<sub>MOD</sub> from given observations of Price and Yield, by rearranging them to solve for MD and C<sub>MOD</sub> - effectively running the price change estimation formulae in the other direction.




== See also ==
== See also ==
* [[Convexity]]
* [[Credit risk]]
* [[Matching]]
* [[Principal risk]]
* [[Modified duration]]
 
[[Category:Interest_Rate_Risk]]
[[Category:Managing_Risk]]

Revision as of 14:50, 20 August 2013

The risk of loss arising from the need to replace a contract before having paid away the principal amount.

Often quantified approximately as the expected profit foregone.


See also