Modified convexity: Difference between revisions

From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson
m (Align with Convexity page definition, to mention portfolios as well as instruments.)
imported>Doug Williamson
(Layout.)
 
(5 intermediate revisions by the same user not shown)
Line 17: Line 17:


The estimation of price change for a given small change in yield can then be calculated as follows:
The estimation of price change for a given small change in yield can then be calculated as follows:


Price change estimation using Modified Duration (MD) only:
Price change estimation using Modified Duration (MD) only:


= - Price x MD x Change in yield
= - Price x MD x Change in yield


Price change estimation using Modified Convexity (C<sub>MOD</sub>):
Price change estimation using Modified Convexity (C<sub>MOD</sub>):


= - [Price x MD x (Change in yield)] + &frac12; x [Price x C<sub>MOD</sub> x (Change in yield)<sup>2</sup>]
= - (Price x MD x (Change in yield) ) + &frac12; x (Price x C<sub>MOD</sub> x (Change in yield)<sup>2</sup> )




Line 30: Line 32:


Therefore the modified convexity adjustment is always positive - it always adds to the estimate of the new price whether yields increase or decrease.
Therefore the modified convexity adjustment is always positive - it always adds to the estimate of the new price whether yields increase or decrease.


It is also possible to estimate the MD and the C<sub>MOD</sub> from given observations of Price and Yield, by rearranging them to solve for MD and C<sub>MOD</sub> - effectively running the price change estimation formulae in the other direction.
It is also possible to estimate the MD and the C<sub>MOD</sub> from given observations of Price and Yield, by rearranging them to solve for MD and C<sub>MOD</sub> - effectively running the price change estimation formulae in the other direction.
Line 38: Line 41:
* [[Matching]]
* [[Matching]]
* [[Modified duration]]
* [[Modified duration]]
* [[Nominal annual rate]]
* [[Portfolio]]


[[Category:Manage_risks]]
[[Category:Manage_risks]]
[[Category:Risk_frameworks]]
[[Category:Risk_frameworks]]

Latest revision as of 21:43, 16 November 2016

(MC).

Broadly speaking, modified convexity measures the curvature of an instrument’s or a portfolio's price function, as yields change - from a given starting point - by a small amount.

More strictly, it is the rate of change of modified duration with respect to yield - at the given starting yield.


Modified convexity can be calculated from Convexity as follows:

Modified Convexity = CMOD = Convexity / (1+r)2


Where:

r = periodic yield = Nominal annual rate / compounding frequency per year


The estimation of price change for a given small change in yield can then be calculated as follows:


Price change estimation using Modified Duration (MD) only:

= - Price x MD x Change in yield


Price change estimation using Modified Convexity (CMOD):

= - (Price x MD x (Change in yield) ) + ½ x (Price x CMOD x (Change in yield)2 )


Because the value v yield relationship is a curve and not a straight line (values do not change linearly as yields change) the estimate of change in value using only modified duration will generally underestimate the new value (because the curve lies above its tangent).

Therefore the modified convexity adjustment is always positive - it always adds to the estimate of the new price whether yields increase or decrease.


It is also possible to estimate the MD and the CMOD from given observations of Price and Yield, by rearranging them to solve for MD and CMOD - effectively running the price change estimation formulae in the other direction.


See also