FAST Modelling Standard: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson (Add link.) |
(Replace broken link.) |
||
Line 19: | Line 19: | ||
A copy of the Standard can be downloaded here: | A copy of the Standard can be downloaded here: | ||
[ | [https://www.fast-standard.org/wp-content/uploads/2019/10/FAST-Standard-02c-July-2019.pdf The FAST Modelling Standard] | ||
Line 33: | Line 33: | ||
* [[Spreadsheet Standards]] | * [[Spreadsheet Standards]] | ||
[[Category:Identify_and_assess_risks]] | |||
[[Category:Manage_risks]] | |||
[[Category:Risk_reporting]] | |||
[[Category:Risk_frameworks]] | |||
[[Category:Technology]] | |||
[[Category:The_business_context]] | [[Category:The_business_context]] | ||
[[Category:Identify_and_assess_risks]] | [[Category:Identify_and_assess_risks]] | ||
[[Category:Manage_risks]] | [[Category:Manage_risks]] | ||
[[Category:Risk_reporting]] | |||
[[Category:Risk_frameworks]] | [[Category:Risk_frameworks]] | ||
[[Category:Technology]] | [[Category:Technology]] | ||
[[Category:The_business_context]] |
Latest revision as of 20:40, 25 December 2024
A set of rules on the structure and design of spreadsheet-based models.
The FAST Standard is designed to provide:
- A clear route to good model design for individual modellers, and
- A common style platform on which modellers and reviewers can rely, when passing models amongst each other.
The FAST Standard's philosophy is:
- Simplicity; and
- Rigorous structuring.
For example, Excel formulae should be:
- Short; and
- Use only a limited set of functions.
A copy of the Standard can be downloaded here: