Forward start swap: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Administrator (CSV import) |
imported>Doug Williamson (Remove surplus link.) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
A forward start swap has its first interest setting and calculation period starting at a future date. | A forward start swap has its first interest setting and calculation period starting at a future date. | ||
For example, in order to hedge a loan to be drawn down at a fixed future date. | For example, in order to hedge a loan to be drawn down at a fixed future date. | ||
== See also == | == See also == | ||
* [[Interest rate swap]] | * [[Interest rate swap]] | ||
* [[Swaption]] | |||
[[Category:Manage_risks]] |
Latest revision as of 20:14, 9 February 2019
A type of interest rate swap.
A forward start swap has its first interest setting and calculation period starting at a future date.
For example, in order to hedge a loan to be drawn down at a fixed future date.