Hedge effectiveness: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson (Link with Hedge.) |
imported>Doug Williamson (Expand for R-Squared and Slope.) |
||
Line 8: | Line 8: | ||
Also known as Hedge efficiency. | Also known as Hedge efficiency. | ||
Metrics for hedge effectiveness include R-Squared and Slope. | |||
Line 16: | Line 19: | ||
* [[Hedge accounting]] | * [[Hedge accounting]] | ||
* [[IAS 39]] | * [[IAS 39]] | ||
* [[R-Squared]] | |||
* [[Slope]] | |||
[[Category:Accounting,_tax_and_regulation]] | [[Category:Accounting,_tax_and_regulation]] | ||
[[Category:Risk_frameworks]] | [[Category:Risk_frameworks]] |
Revision as of 18:18, 3 February 2018
The degree to which changes in the fair value or cash flows of a hedged item that are attributable to the hedged risk are offset by changes in the fair value or cash flows of the related hedging instrument.
In a situation where a hedge is ineffective (or inefficient) the ineffectiveness may arise from:
- Basis risk or basis differences; or
- Differences between the quantum of (i) the hedged item and (ii) the hedging instrument.
Also known as Hedge efficiency.
Metrics for hedge effectiveness include R-Squared and Slope.