Process costing: Difference between revisions

From ACT Wiki
Jump to navigationJump to search
imported>Administrator
(CSV import)
 
imported>Doug Williamson
(Layout.)
Line 2: Line 2:


Under process costing, costs are accumulated for each separate process or operation for a period of time, and then averaged by dividing the total cumulative costs for the period by a measure of the output (for the same period).   
Under process costing, costs are accumulated for each separate process or operation for a period of time, and then averaged by dividing the total cumulative costs for the period by a measure of the output (for the same period).   


== See also ==
== See also ==
* [[Job costing]]
* [[Job costing]]

Revision as of 11:24, 22 June 2016

Process costing (rather than job costing) is used when production is of homogenous items and is organised on a continuous or flow-line basis.

Under process costing, costs are accumulated for each separate process or operation for a period of time, and then averaged by dividing the total cumulative costs for the period by a measure of the output (for the same period).


See also