Variable cost: Difference between revisions

From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson
(Expand definition.)
imported>Doug Williamson
(Expand definition.)
Line 10: Line 10:
Therefore a lower-risk operational strategy is normally to have a lower proportion of fixed costs in the total cost structure, and a higher proportion of variable costs.
Therefore a lower-risk operational strategy is normally to have a lower proportion of fixed costs in the total cost structure, and a higher proportion of variable costs.


 
This proportion is sometimes known as operational gearing.





Revision as of 15:19, 3 April 2021

Cost and management accounting.

A variable cost is a cost which increases as the level of production (or other activity) increases, because it is incurred as a consequence of the production or other activity.

Contrasted with a fixed cost.


Variable costs are generally easier to change - especially to reduce - when necessary, compared with fixed costs.

Therefore a lower-risk operational strategy is normally to have a lower proportion of fixed costs in the total cost structure, and a higher proportion of variable costs.

This proportion is sometimes known as operational gearing.