PRINCE2: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson (Create the page. Source: PRINCE2 methodology page: https://www.prince2.com/prince2-methodology) |
imported>Doug Williamson (Punctuation.) |
||
Line 5: | Line 5: | ||
The key features of PRINCE2 include: | The key features of PRINCE2 include: | ||
*Emphasis on dividing the project into manageable and controllable stages | *Emphasis on dividing the project into manageable and controllable stages. | ||
*Flexibility that can be applied at a level appropriate to the project. | *Flexibility that can be applied at a level appropriate to the project. | ||
Revision as of 11:34, 4 July 2015
Project management.
PRojects IN Controlled Environments, published in 1996.
The key features of PRINCE2 include:
- Emphasis on dividing the project into manageable and controllable stages.
- Flexibility that can be applied at a level appropriate to the project.